From tomorrow (Tuesday, March 12) Wales & West will start works on High Street, Johnstown, to repair a gas leak.
The works, which are close to Bangor Road, will require the permanent signals to be switched off and a set of temporary signals, with pedestrian facilities, to be placed at this location to cover the works.
These works are planned for a period of 4-days, during which the signals will be manually controlled between the hours of 7:00am and 7:00pm.
Need school transport in September? Apply online now
APPLY ONLINE NOW